Gald Manufacturing & Production SAMPLE SYSTEM ← Loyalty & RewardsAgriTech & Farm… → ALL
mes.planta.do/lines
PLPlanta
Lines4Work orders18Quality3Downtime
Planning
ScheduleMaterialsMaintenance
Analysis
OEETraceability
IB
Ing. Bernardo SosaJefe de planta

Production lines

Turno B · 4 líneas · OEE 78.4%
Work order, line, batchShift reportRelease order
OEE
78.4%
▲ 2.1 pts vs last shift
Units this shift
18,412
▼ 88% of the 21,000 target
Scrap rate
1.9%
▼ 0.4 pts worse
Unplanned downtime
41 min
▼ 2 events

Line status

LineProductWork orderRateProgressOEEState
L-01Botella 500 ml — aguaWO-7741412 u/min84%91.2%Running
L-02Botella 1.5 L — aguaWO-7744288 u/min61%84.6%Running
L-03Jugo de naranja 1 LWO-77390 u/min38%52.1%Stopped
L-04Té frío 500 mlWO-7746196 u/min22%88.0%Changeover

OEE breakdown

Availability88.2%
Performance92.4%
Quality96.2%
78%
OEE del turno

Downtime this shift

L-03 · falla en llenadora28 min · sensor de nivel · mantenimiento en sitioUnplanned
L-01 · falta de preformas13 min · reabastecido desde almacénMaterial
L-04 · cambio de formato34 min · planificado · 500 ml → 1 LPlanned
L-02 · muestreo de calidad6 min · lote 2026-08-24-BQuality

Quality holds

BatchProductReasonUnitsStatus
B-4412Jugo de naranja 1 LBrix fuera de especificación (10.8 vs 11.2)4,180Hold
B-4409Botella 500 mlTorque de tapa bajo en muestreo1,204Re-testing
B-4401Té frío 500 mlEtiqueta descentrada — cosmético820Rework
B-4396Botella 1.5 LLiberado tras análisis microbiológico12,400Released